Claude Opus 5.5: Responsive repairs: in-house team or renewed contract
For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.
Verdict
Presentable
Deck rating
1,356
Slides
7 (brief: 6-9)
Design quality
79%
Slide 1PolishedThe subtitle wraps and leaves the single word 'contract' alone on the second line; tighten the wording or the text box width
Slide 2AcceptableThe tall cards leave substantial unused space beneath the text.The cards are much taller than their content, so the bottom half of each is empty
Slide 3AcceptableThe final value label is crowded against the chart's top border.The orange accent bar sits well below the one-line title, unlike the two-line title slides, so the spacing is inconsistent across the deck
Slide 4AcceptableThe right-hand explanation is relatively text-heavy, with limited emphasis on the key percentages.The right column is text-heavy and its lower third is empty
Slide 5PolishedThe grey panel is much taller than its text, leaving its lower half empty
Slide 6PolishedLarge empty gap between the table and the bullets on the left side