Benchmarks / DeckBench / Northgate Homes
Measured by Spring Prompt
Gemini 3.5 Flash Lite: Responsive repairs: in-house team or renewed contract
For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.
- Verdict
- Not presentable
- Deck rating
- 644
- Slides
- 7 (brief: 6-9)
- Design quality
- 57%
Why it is not presentable
- Layout defect: something off the slide, colliding, too small or too faint to read
- Made a material claim the analysis does not support
In detail
- Slide 2: “Indicative price of £3.8m given: the deck quotes this price despite the analysis explicitly prohibiting quotation until procurement has a formal bid.” is not supported by the analysis.
- Slide 5: “The rise in complaints directly reflects the frustration of lengthening wait times and growing backlog.” is not supported by the analysis.
- Slide 7: “Avoids a full 5-year contract renewal.” is not supported by the analysis.
- Slide 7: “In-house team secures long-term service quality and direct accountability to tenants” is not supported by the analysis.
- Slide 7: “Avoids a full 5-year contract renewal” is not supported by the analysis.
- Slide 1: text 2: #E4572E on #1D5C63 is 2.1:1.