Benchmarks / DeckBench / Northgate Homes

Measured by Spring Prompt

Grok 4.7: Responsive repairs: in-house team or renewed contract

For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.

Verdict
Not presentable
Deck rating
1,242
Slides
7 (brief: 6-9)
Design quality
93%

Why it is not presentable

  • Layout defect: something off the slide, colliding, too small or too faint to read

In detail

  • Slide 1: text 3: #E4572E on #1D5C63 is 2.1:1.
  1. Slide 1 of Grok 4.7's deck
    Slide 1Polished
  2. Slide 2 of Grok 4.7's deck
    Slide 2Polished The three cards are half empty below their bullet lines, which wastes space.
  3. Slide 3 of Grok 4.7's deck
    Slide 3Polished
  4. Slide 4 of Grok 4.7's deck
    Slide 4Polished Four explanatory cards alongside the chart make this slide comparatively text-heavy.
  5. Slide 5 of Grok 4.7's deck
    Slide 5Polished The lower half of the dark 92% panel is empty.
  6. Slide 6 of Grok 4.7's deck
    Slide 6Acceptable A large empty band between the table and the cards makes the layout feel less balanced.There is a large empty gap between the table and the cards.
  7. Slide 7 of Grok 4.7's deck
    Slide 7Polished The generic title 'The decision' could state the requested approval directly.