GPT-6 Astra: Responsive repairs: in-house team or renewed contract
For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.
Verdict
Not presentable
Deck rating
1,489
Slides
7 (brief: 6-9)
Design quality
79%
Why it is not presentable
A slide the judges rated as needing work
Slide 1Polished
Slide 2Polished
Slide 3Polished
Slide 4AcceptableThe lengthy bottom callout is crowded toward the footer, with 'change.' stranded on a third line.Bottom takeaway wraps to three lines, with the orphaned word 'change.' crowding the source line
Slide 5PolishedVertical divider has a visible break partway down
Slide 6PolishedLarge empty gap between the table and the lower panels
Slide 7Needs workThe middle card's text overflows its white panel: the final word, 'built.', is cut off at the bottom and loses contrast against the teal background.Text in the middle card ('built') overflows and is cut off at the bottom of the card