Benchmarks / DeckBench / Kestrel Logistics

Measured by Spring Prompt

Gemini 3.1 Pro Preview: On-time delivery: what is going wrong and what to fund

For the board and the company's three main investors. The decision it supports: whether to fund 40 more drivers or a trunk re-plan with 10 drivers.

Verdict
Not presentable
Deck rating
867
Slides
5 (brief: 5-8)
Design quality
50%

Why it is not presentable

  • Layout defect: something off the slide, colliding, too small or too faint to read
  • Did not give the analysis's recommendation within the first two slides
  • A slide the judges rated as needing work

In detail

  • Slide 4: text 2 and table 3 collide.
  1. Slide 1 of Gemini 3.1 Pro Preview's deck
    Slide 1Polished
  2. Slide 2 of Gemini 3.1 Pro Preview's deck
    Slide 2Acceptable Four lengthy bullets make the left column text-heavy.The chart does not mark the 93% contract floor, so the takeaway in the title is not shown visually.
  3. Slide 3 of Gemini 3.1 Pro Preview's deck
    Slide 3Acceptable The left column is text-heavy, with the final four-line bold bullet sitting close to the bottom edge.All bars are the same colour, so the chart does not emphasise late trunking, the key bar.
  4. Slide 4 of Gemini 3.1 Pro Preview's deck
    Slide 4Needs work The table header overlaps and obscures the final line of the Option 2 paragraph.The table overlaps the last line of Option 2 text ('mid-evening departures'), making it unreadable.
  5. Slide 5 of Gemini 3.1 Pro Preview's deck
    Slide 5Acceptable Large, bold action bullets give funding, implementation and monitoring similar prominence, weakening emphasis on the funding decision.The title is a topic label; a takeaway such as the funding ask would be stronger.