Benchmarks / DeckBench / Northgate Homes

Measured by Spring Prompt

Inkling 2 Mini: Responsive repairs: in-house team or renewed contract

For the board of trustees of a housing association, including two tenant board members. The decision it supports: whether to approve £1.2m to set up an in-house repairs team or renew the contract.

Verdict
Not presentable
Deck rating
792
Slides
8 (brief: 6-9)
Design quality
75%

Why it is not presentable

  • Layout defect: something off the slide, colliding, too small or too faint to read
  • Made a material claim the analysis does not support

In detail

  • Slide 6: “If the in-house team doesn't perform, the saving disappears — which is why the ask is a 12-month bridging contract.” is not supported by the analysis.
  • Slide 7: “If in-house fails, the bridging contract keeps the board covered; it is the safety net.” is not supported by the analysis.
  • Slide 8: “The bridging contract is in place until month 12, so the board is never without a provider.” is not supported by the analysis.
  • Slide 7: “What the chair will press: renewal avoids a £1.2m gamble; the 3-year payback assumes the new team performs at the claimed running cost. This replaces the chair's actual stated view, that the backlog is mostly down to the October system change, and the analysis's rebuttal of it.” is not supported by the analysis.
  • Slide 7: “If the team is not performing by month 12, renew — and we have told the board that at the start.” is not supported by the analysis.
  • Slide 7: “12-month bridging contract at performance targets — review in September 2026. This is inconsistent with a 12-month bridge starting when the contract ends in September 2026.” is not supported by the analysis.
  • Slide 7: “WHAT THE CHAIR WILL PRESS: Renewal avoids a £1.2m gamble... The 3-year payback assumes... The failure mode matters...” is not supported by the analysis.
  • Slide 1: A body text box set at 10.5 pt, too small to read
  1. Slide 1 of Inkling 2 Mini's deck
    Slide 1Download slide imagePolished
  2. Slide 2 of Inkling 2 Mini's deck
    Slide 2Download slide imagePolished Title states a fact (contract end date), not the takeaway; the recommendation only appears in the bottom banner
  3. Slide 3 of Inkling 2 Mini's deck
    Slide 3Download slide imagePolished Chart uses a default boxed frame, inconsistent with the open-axis chart styling on slides 4 and 5
  4. Slide 4 of Inkling 2 Mini's deck
    Slide 4Download slide imageAcceptable The chart gives every month equal visual emphasis; an October marker or annotation would connect the system-change takeaway to the bars more directly.Chart does not mark or annotate the October system change, so the headline is not visibly supported by the visual
  5. Slide 5 of Inkling 2 Mini's deck
    Slide 5Download slide imageAcceptable The oversized lower-right warning box contains substantial unused space, making the layout feel less balanced than the other chart slides.Title carries two messages, which splits the point
  6. Slide 6 of Inkling 2 Mini's deck
    Slide 6Download slide imageAcceptable A large empty gap separates the comparison table from the lower-left cards, fragmenting the layout.Large empty gap below the table on the left makes the layout unbalanced
  7. Slide 7 of Inkling 2 Mini's deck
    Slide 7Download slide imageAcceptable The slide is text-heavy, with a bullet list, two prose callouts and a separate note competing for reading time.Text-heavy, with bullets on the left and paragraph cards on the right
  8. Slide 8 of Inkling 2 Mini's deck
    Slide 8Download slide imagePolished